PLAN 2004: Repair Projects

Click on one of the links below to see a school name and description of that project:
(Use BACK button on your browser to return to the top of this page)

|1. Apex Hs.| |2. Aversboro Elem.| |3. Brassfield Elem.| |4. Brentwood Elem.| |5. Brooks Elem.| |6.Broughton Hs.| |7. Bugg Elem.| |8. CARNAGE MS.| |9. Conn Elem.| |10. Creech Rd. Elem.| |11. East Millbrook Ms.| |12. East Wake Hs.| |13.East Wake Ms.| |14. Fox Rd. Elem.| |15. Fuquay Varina Elem.| |16. Fuquay Varina Hs.| |17. Garner Hs.| |18. Green Elem.| |19. Knightdale Elem.| |20. Lacy Elem.| |21. Lead Mine Elem.| |22. Leesville Elem.| |23. Lincoln Heights Elem.| |24. Lockhart Elem.| |25. Northridge Elem.| |26. Oak Grove Elem.| |27. Parent Volunteer Program| |28. Penny Rd. Elem.| |29. Pleasant Union Elem.| |30. Poe Elem.| |31. Reedy Creek Elem.| |32. Root Elem.| | 33. Sanderson Hs.| |34. Smith Elem.| |35. Stough Elem.| |36. Swift Creek Elem.| |37. Vance Elem.| |38. Vandora Springs Elem.| |39. Various Schools| |40. Various Schools| |41. Wake Forest Hs.| |42. Wake Forest Ms.| |43. Wakefield Hs.| |44. Wendell Elem.| |45. West Cary Ms.| |46. West Millbrook Ms.| |47. Wilburn Elem.| |48. Willow Springs Elem.| |49. Yates Mill Elem.| |50. York Elem.| |51. Zebulon Elem.| |52. Zebulon Ms.|





You can download a PDF version or html version of the Repair Projects list here.
You can download an html version of the Repair Projects map here. PDF versions of this map, in page ( 251 KB) and wall ( 927 KB) size are also available.

PLAN 2004 School Building Program (2004-2008)

52 Repair Projects

Project Number

School Name

Scope Of Work

Total Project Cost

1

Apex High

Sandblast and paint structural steel in stadium-$40K / New Serving Line

$103,373

2

Aversboro Elementary

Floors throughout

$271,638

3

Brassfield Elementary

Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger

$1,113,531

4

Brentwood Elementary

Rpl Boiler

$112,035

5

Brooks Elementary

Rpl outdoor condensing unit serving multi-purpose room-$40K/ Rpl carpet multi-purpose room-$30K

$75,804

6

Broughton High

Rpl cooler and freezer. Replace two 180 ton chillers

$312,357

7

Bugg Elementary

Rpr driveway, restripe pkg lot-$35K

$38,196

8

Carnage Middle

Floor and Ceiling in areas not addressed in last renovation

$116,939

9

Conn Elementary

Rpl boilers

$130,184

10

Creech Rd. Elementary

Rpl Cooling Tower and Pumps

$176,506

11

East Millbrook Middle

Correct drainage-$25K / Rpl flooring throughout except admin or Bldg 1. New Cooler & Freezer

$326,919

12

East Wake High

Replace flooring in misc. areas / New Serving Lines

$217,628

13

East Wake Middle

Flooring throughout / New water and sewer service including generator and well house. New Serving Line

$1,227,817

14

Fox Road Elementary

Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger

$1,113,531

15

Fuquay Elementary

Flooring throughout. New Serving Line. Water and sewer improvements including generator, auto dialer and transfer switch.

$332,394

16

Fuquay High

Pave back parking lot, new bus storage lot and resurface existing paved lots. Sandblast and paint structural steel in stadium. Flooring throughout except new additions. New Serving Line

$477,875

17

Garner High

Ventilate mech room in kitchen for step down transformer, rpl AHU (4-6) units located in center of old main bldg. Fix air flow problems. Rpl fan coil units in kitchen. Flooring in classrooms. New Serving Line. Water and sewer improvements including generator, auto dialer and transfer switch.

$496,754

18

Green Elementary

Flooring multi-purpose room and classrooms

$272,035

19

Knightdale Elementary

Rpl cooler and freezer.

$30,123

20

Lacy Elementary

HVAC Renovations and finishes in media center, computer classroom and Kitchen / Condensing Unit in Multi-Purpose Room / Lower mechanical equipment

$807,195

21

Lead Mine Elementary

Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger

$1,113,531

22

Leesville Elementary

Flooring throughout

$291,730

23

Lincoln Heights Elementary

Flooring throughout. New Serving Line

$219,734

24

Lockhart Elementary

Flooring throughout except additions

$197,772

25

Northridge Elementary

New Serving Line

$24,133

26

Oak Grove Elementary

Flooring throughout

$291,730

27

Parent Volunteer Program

Funding for Matching Grant Program

$453,074

28

Penny Rd Elementary

Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger. New Serving Line

$1,135,801

29

Pleasant Union Elementary

Rpl cooling tower and heat exchanger. Provide centrifugal separator and pumps, Rpl carpet throughout.

$530,910

30

Poe Elementary

Rpl flooring in mult-purpose room and other misc areas. Rpl heat pumps serving multi-purpose rm bldg.

$130,184

31

Reedy Creek Elementary

Water and sewer improvements including generator, auto dialer and transfer switch.

$42,776

32

Root Elementary

Correct drainage with retaining wall-$750K / Rpl condensing unit for multipurpose room- $40K / Overlay Asphalt-$70K. New Serving Line

$954,410

33

Sanderson High

Provide ventilation air to East Building

$288,884

34

Smith Elementary

New Walk-In Cooler & Freezer

$30,123

35

Stough Elementary

Uprgrade restrooms and flooring left out of previous renovations

$560,107

36

Swift Creek Elementary

Water and sewer improvements including generator, auto dialer and transfer switch.

$42,776

37

Vance Elementary

Rpl Cooling Tower and Pumps. Repipe Mechanical Room. Rpl Carpet Throughout. New Serving Line. Water & Sewer improvements including generator, auto dialer and transfer switch.

$595,095

38

Vandora Springs Elementary

Resurface basketball courts-$10K. Rpl rooftop units for media center and install BAS controls.

$162,730

39

Various Schools

ADA Needs from Carter Burgess Survey

$2,265,372

40

Various Schools

ADA Playground Surfacing @ 50 Schools

$2,265,372

41

Wake Forest High

Rpr drive-$70K / Rpl cooling tower.

$297,168

42

Wake Forest Middle

Rpl cooling tower / New Walk-In Cooler & Freezer

$199,488

43

Wakefield High

Water & sewer improvements including generator, auto dialer, & transfer switch

$41,307

44

Wendell Elementary

Rpl boiler and cooling tower. New Serving Line

$274,946

45

West Cary Middle

Rpl Flooring throughout except 1996 Bldg

$281,710

46

West Millbrook Middle

Correct drainage / Rpl ashpalt / Rpl carpet

$707,528

47

Wilburn Elementary

Flooring throughout except 8 classrooms and multi-purpose room

$169,026

48

Willow Springs Elementary

Water & sewer improvements including generator, auto dialer, & transfer switch

$42,776

49

Yates Mill Elementary

Water & sewer improvements including generator, auto dialer, & transfer switch

$41,307

50

York Elementary

Rpl main boiler

$112,345

51

Zebulon Elementary

Rpl Carpet throughout. New Serving Line

$304,247

52

Zebulon Middle

Asphalt track-$75,000. Flooring throughout except new addition

$338,068

 

TOTAL

 

$22,158,993