|1. Apex Hs.| |2.
Aversboro Elem.| |3. Brassfield
Elem.| |4. Brentwood Elem.|
|5. Brooks Elem.| |6.Broughton
Hs.| |7. Bugg Elem.| |8.
CARNAGE MS.| |9. Conn Elem.|
|10. Creech Rd. Elem.| |11.
East Millbrook Ms.| |12. East Wake Hs.| |13.East Wake Ms.| |14. Fox Rd. Elem.|
|15. Fuquay Varina Elem.|
|16. Fuquay Varina Hs.| |17.
Garner Hs.| |18.
Green Elem.| |19.
Knightdale Elem.| |20.
Lacy Elem.| |21. Lead Mine
Elem.| |22. Leesville Elem.|
|23. Lincoln Heights Elem.|
|24. Lockhart Elem.| |25.
Northridge Elem.| |26. Oak
Grove Elem.| |27. Parent
Volunteer Program| |28. Penny
Rd. Elem.| |29. Pleasant
Union Elem.| |30. Poe Elem.| |31. Reedy
Creek Elem.| |32. Root Elem.| |
33. Sanderson Hs.| |34. Smith
Elem.| |35. Stough Elem.|
|36. Swift Creek Elem.|
|37. Vance Elem.| |38.
Vandora Springs Elem.| |39.
Various Schools| |40. Various
Schools| |41. Wake Forest Hs.|
|42. Wake Forest Ms.| |43.
Wakefield Hs.| |44. Wendell
Elem.| |45. West Cary Ms.|
|46. West Millbrook Ms.|
|47. Wilburn Elem.| |48.
Willow Springs Elem.| |49.
Yates Mill Elem.| |50. York
Elem.| |51. Zebulon Elem.|
|52. Zebulon Ms.|
You can download a
PDF version or html
version of the Repair Projects list here.
You can download an html
version of the Repair Projects map here. PDF
versions of this map, in page
( 251 KB) and wall
( 927 KB) size are also available.
PLAN 2004 School Building Program (2004-2008) |
|||
52 Repair Projects |
|||
Project Number |
School Name |
Scope Of Work |
Total Project Cost |
1 |
Sandblast and paint structural steel in stadium-$40K / New Serving Line |
$103,373 |
|
2 |
Floors throughout |
$271,638 |
|
3 |
Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger |
$1,113,531 |
|
4 |
Rpl Boiler |
$112,035 |
|
5 |
Rpl outdoor condensing unit serving multi-purpose room-$40K/ Rpl carpet multi-purpose room-$30K |
$75,804 |
|
6 |
Rpl cooler and freezer. Replace two 180 ton chillers |
$312,357 |
|
7 |
Rpr driveway, restripe pkg lot-$35K |
$38,196 |
|
8 |
Floor and Ceiling in areas not addressed in last renovation |
$116,939 |
|
9 |
Rpl boilers |
$130,184 |
|
10 |
Rpl Cooling Tower and Pumps |
$176,506 |
|
11 |
Correct drainage-$25K / Rpl flooring throughout except admin or Bldg 1. New Cooler & Freezer |
$326,919 |
|
12 |
Replace flooring in misc. areas / New Serving Lines |
$217,628 |
|
13 |
Flooring throughout / New water and sewer service including generator and well house. New Serving Line |
$1,227,817 |
|
14 |
Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger |
$1,113,531 |
|
15 |
Flooring throughout. New Serving Line. Water and sewer improvements including generator, auto dialer and transfer switch. |
$332,394 |
|
16 |
Pave back parking lot, new bus storage lot and resurface existing paved lots. Sandblast and paint structural steel in stadium. Flooring throughout except new additions. New Serving Line |
$477,875 |
|
17 |
Ventilate mech room in kitchen for step down transformer, rpl AHU (4-6) units located in center of old main bldg. Fix air flow problems. Rpl fan coil units in kitchen. Flooring in classrooms. New Serving Line. Water and sewer improvements including generator, auto dialer and transfer switch. |
$496,754 |
|
18 |
Flooring multi-purpose room and classrooms |
$272,035 |
|
19 |
Rpl cooler and freezer. |
$30,123 |
|
20 |
HVAC Renovations and finishes in media center, computer classroom and Kitchen / Condensing Unit in Multi-Purpose Room / Lower mechanical equipment |
$807,195 |
|
21 |
Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger |
$1,113,531 |
|
22 |
Flooring throughout |
$291,730 |
|
23 |
Flooring throughout. New Serving Line |
$219,734 |
|
24 |
Flooring throughout except additions |
$197,772 |
|
25 |
New Serving Line |
$24,133 |
|
26 |
Flooring throughout |
$291,730 |
|
27 |
Funding for Matching Grant Program |
$453,074 |
|
28 |
Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger. New Serving Line |
$1,135,801 |
|
29 |
Rpl cooling tower and heat exchanger. Provide centrifugal separator and pumps, Rpl carpet throughout. |
$530,910 |
|
30 |
Rpl flooring in mult-purpose room and other misc areas. Rpl heat pumps serving multi-purpose rm bldg. |
$130,184 |
|
31 |
Water and sewer improvements including generator, auto dialer and transfer switch. |
$42,776 |
|
32 |
Correct drainage with retaining wall-$750K / Rpl condensing unit for multipurpose room- $40K / Overlay Asphalt-$70K. New Serving Line |
$954,410 |
|
33 |
Provide ventilation air to East Building |
$288,884 |
|
34 |
New Walk-In Cooler & Freezer |
$30,123 |
|
35 |
Uprgrade restrooms and flooring left out of previous renovations |
$560,107 |
|
36 |
Water and sewer improvements including generator, auto dialer and transfer switch. |
$42,776 |
|
37 |
Rpl Cooling Tower and Pumps. Repipe Mechanical Room. Rpl Carpet Throughout. New Serving Line. Water & Sewer improvements including generator, auto dialer and transfer switch. |
$595,095 |
|
38 |
Resurface basketball courts-$10K. Rpl rooftop units for media center and install BAS controls. |
$162,730 |
|
39 |
ADA Needs from Carter Burgess Survey |
$2,265,372 |
|
40 |
ADA Playground Surfacing @ 50 Schools |
$2,265,372 |
|
41 |
Rpr drive-$70K / Rpl cooling tower. |
$297,168 |
|
42 |
Rpl cooling tower / New Walk-In Cooler & Freezer |
$199,488 |
|
43 |
Water & sewer improvements including generator, auto dialer, & transfer switch |
$41,307 |
|
44 |
Rpl boiler and cooling tower. New Serving Line |
$274,946 |
|
45 |
Rpl Flooring throughout except 1996 Bldg |
$281,710 |
|
46 |
Correct drainage / Rpl ashpalt / Rpl carpet |
$707,528 |
|
47 |
Flooring throughout except 8 classrooms and multi-purpose room |
$169,026 |
|
48 |
Water & sewer improvements including generator, auto dialer, & transfer switch |
$42,776 |
|
49 |
Water & sewer improvements including generator, auto dialer, & transfer switch |
$41,307 |
|
50 |
Rpl main boiler |
$112,345 |
|
51 |
Rpl Carpet throughout. New Serving Line |
$304,247 |
|
52 |
Asphalt track-$75,000. Flooring throughout except new addition |
$338,068 |
|
|
TOTAL |
|
$22,158,993 |