| PLAN
2004 SCHOOL BUILDING PROGRAM (2004-2008) |
|||
| 52
Repair Projects |
|||
PROJECT
NUMBER |
SCHOOL
NAME |
SCOPE
OF WORK |
TOTAL
PROJECT COST |
1 |
Apex High | Sandblast and paint structural steel in stadium-$40K / New Serving Line | $103,373 |
2 |
Aversboro Elementary | Floors throughout | $271,638 |
3 |
Brassfield Elementary | Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger | $1,113,531 |
4 |
Brentwood Elementary | Rpl Boiler | $112,035 |
5 |
Brooks Elementary | Rpl outdoor condensing unit serving multi-purpose room-$40K/ Rpl carpet multi-purpose room-$30K | $75,804 |
6 |
Broughton High | Rpl cooler and freezer. Replace two 180 ton chillers | $312,357 |
7 |
Bugg Elementary | Rpr driveway, restripe pkg lot-$35K | $38,196 |
8 |
Carnage Middle | Floor and Ceiling in areas not addressed in last renovation | $116,939 |
9 |
Conn Elementary | Rpl boilers | $130,184 |
10 |
Creech Rd. Elementary | Rpl Cooling Tower and Pumps | $176,506 |
11 |
East Millbrook Middle | Correct drainage-$25K / Rpl flooring throughout except admin or Bldg 1. New Cooler & Freezer | $326,919 |
12 |
East Wake High | Replace flooring in misc. areas / New Serving Lines | $217,628 |
13 |
East Wake Middle | Flooring throughout / New water and sewer service including generator and well house. New Serving Line | $1,227,817 |
14 |
Fox Road Elementary | Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger | $1,113,531 |
15 |
Fuquay Elementary | Flooring throughout. New Serving Line. Water and sewer improvements including generator, auto dialer and transfer switch. | $332,394 |
16 |
Fuquay High | Pave back parking lot, new bus storage lot and resurface existing paved lots. Sandblast and paint structural steel in stadium. Flooring throughout except new additions. New Serving Line | $477,875 |
17 |
Garner High | Ventilate mech room in kitchen for step down transformer, rpl AHU (4-6) units located in center of old main bldg. Fix air flow problems. Rpl fan coil units in kitchen. Flooring in classrooms. New Serving Line. Water and sewer improvements including generator, auto dialer and transfer switch. | $496,754 |
18 |
Green Elementary | Flooring multi-purpose room and classrooms | $272,035 |
19 |
Knightdale Elementary | Rpl cooler and freezer. | $30,123 |
20 |
Lacy Elementary | HVAC Renovations and finishes in media center, computer classroom and Kitchen / Condensing Unit in Multi-Purpose Room / Lower mechanical equipment | $807,195 |
21 |
Lead Mine Elementary | Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger | $1,113,531 |
22 |
Leesville Elementary | Flooring throughout | $291,730 |
23 |
Lincoln Heights Elementary | Flooring throughout. New Serving Line | $219,734 |
24 |
Lockhart Elementary | Flooring throughout except additions | $197,772 |
25 |
Northridge Elementary | New Serving Line | $24,133 |
26 |
Oak Grove Elementary | Flooring throughout | $291,730 |
27 |
Parent Volunteer Program | Funding for Matching Grant Program | $453,074 |
28 |
Penny Rd Elementary | Carpet and HVAC like Rand Rd except include Cooling Tower and heat exchanger. New Serving Line | $1,135,801 |
29 |
Pleasant Union Elementary | Rpl cooling tower and heat exchanger. Provide centrifugal separator and pumps, Rpl carpet throughout. | $530,910 |
30 |
Poe Elementary | Rpl flooring in mult-purpose room and other misc areas. Rpl heat pumps serving multi-purpose rm bldg. | $130,184 |
31 |
Reedy Creek Elementary | Water and sewer improvements including generator, auto dialer and transfer switch. | $42,776 |
32 |
Root Elementary | Correct drainage with retaining wall-$750K / Rpl condensing unit for multipurpose room- $40K / Overlay Asphalt-$70K. New Serving Line | $954,410 |
33 |
Sanderson High | Provide ventilation air to East Building | $288,884 |
34 |
Smith Elementary | New Walk-In Cooler & Freezer | $30,123 |
35 |
Stough Elementary | Uprgrade restrooms and flooring left out of previous renovations | $560,107 |
36 |
Swift Creek Elementary | Water and sewer improvements including generator, auto dialer and transfer switch. | $42,776 |
37 |
Vance Elementary | Rpl Cooling Tower and Pumps. Repipe Mechanical Room. Rpl Carpet Throughout. New Serving Line. Water & Sewer improvements including generator, auto dialer and transfer switch. | $595,095 |
38 |
andora Springs Elementary | Resurface basketball courts-$10K. Rpl rooftop units for media center and install BAS controls. | $162,730 |
39 |
Various Schools | ADA Needs from Carter Burgess Survey | $2,265,372 |
40 |
Various Schools | ADA Playground Surfacing @ 50 Schools | $2,265,372 |
41 |
Wake Forest High | Rpr drive-$70K / Rpl cooling tower. | $297,168 |
42 |
Wake Forest Middle | Rpl cooling tower / New Walk-In Cooler & Freezer | $199,488 |
43 |
Wakefield High | Water & sewer improvements including generator, auto dialer, & transfer switch | $41,307 |
44 |
Wendell Elementary | Rpl boiler and cooling tower. New Serving Line | $274,946 |
45 |
West Cary Middle | Rpl Flooring throughout except 1996 Bldg | $281,710 |
46 |
West Millbrook Middle | Correct drainage / Rpl ashpalt / Rpl carpet | $707,528 |
47 |
Wilburn Elementary | Flooring throughout except 8 classrooms and multi-purpose room | $169,026 |
48 |
Willow Springs Elementary | Water & sewer improvements including generator, auto dialer, & transfer switch | $42,776 |
49 |
Yates Mill Elementary | Water & sewer improvements including generator, auto dialer, & transfer switch | $41,307 |
50 |
York Elementary | Rpl main boiler | $112,345 |
51 |
Zebulon Elementary | Rpl Carpet throughout. New Serving Line | $304,247 |
52 |
Zebulon Middle | Asphalt track-$75,000. Flooring throughout except new addition | $338,068 |
| TOTAL | $22,158,993 | ||