PLAN 2000 Project Summary By School


Elementary
| Middle | High | Special/Optional

Elementary Schools

· Adams - Correct erosion problems. $15,000

· Apex - (2003) Consolidate campus and make connections to existing buildings; demolish classroom buildings (#1, #2, #4) and cafeteria building (#5); build new classrooms, child nutrition, and plant operations; expand support spaces as needed; upgrade gym and support spaces; expand parking and improve traffic pattern; provide deferred maintenance and modernization. $11.3 million

· Aversboro - Air condition kitchen; upgrade driveway and parking lot; replace hot water heater. $147,000

· Baucom - (2001) Demolish Building #2 originally scheduled in previous building program; replace HVAC system in Building #1; renovate for plant operations; air condition kitchen. $1.1 million

· Brassfield - Replace roof coating for cafeteria, kitchen, and connectors; correct erosion problems. $135,000

· Brentwood - Air condition kitchen; replace carpet, lights, ceiling tile in older sections; grade site to correct erosion problems. $310,000

· Briarcliff - Correct erosion problems; air condition kitchen $110,000

· Brooks - Replace carpet in older sections; upgrade driveway and parking lot. $110,000

· Bugg - Air condition kitchen; grade site to correct erosion problems. $105,000

· Cary - (2003) Vacate main building (#1) based on proposal from Town of Cary; demolish and replace cafeteria and L-shaped building (#3); build classrooms to include special education, art, music, and support spaces; build media center and child nutrition services; upgrade gym and support spaces; provide deferred maintenance and modernization. $11.2 million

· Combs - (2002) Upgrade existing classrooms and toilets; build two classrooms; renovate dining area; provide deferred maintenance and modernization needs. $2.9 million

· Conn - Correct erosion problems. $10,000

· Creech Road - Replace carpet, upgrade HVAC; correct erosion problems. $160,000

· Davis Drive - Correct erosion problems; provide fence for perimeter. $25,000

· Douglas - Air condition kitchen; correct erosion problems; upgrade driveway and parking lot; build covered walkway between classrooms and cafeteria; upgrade HVAC system. $220,000

· Durant Road - Replace carpet. $110,000

· Farmington Woods - (July 2003) Build seven classrooms to include pre-K, Kindergarten, music, and plant operations; upgrade all areas to include classrooms, media center, multi-purpose, and administration; renovate kitchen and provide new serving line; upgrade and expand parking; improve traffic patterns; provide deferred maintenance and modernization. $8.4 million

· Fox Road - Replace roof coating for cafeteria, kitchen, and connectors; replace carpet throughout campus; replace HVAC cooling tower. $300,000

· Fuller - Replace roof; air condition kitchen; upgrade driveway and parking lot; grade site to correct erosion problems. $520,000

· Fuquay-Varina - Replace roof on main building; air condition kitchen; replace HVAC heat exchanger serving entire campus. $871,000

· Green - Pave parking lot; correct erosion problems; air condition kitchen. $170,000

· Hilburn Drive - Correct erosion problems. $10,000

· Hodge Road -Correct erosion problems. $15,000

· Holly Springs - Correct erosion problems. $10,000

· Hunter - Upgrade driveway and parking lot. $25,000

· Jones Dairy - Correct erosion problems. $20,000

· Joyner - (December 2002) Build 10 classrooms, pre-K facility; renovate and expand dining and provide serving line; air condition kitchen and provide new cooler/freezer; renovate and expand administration area; upgrade classrooms, corridors, toilets; improve traffic circulation and parking; provide deferred maintenance and modernization. $8.6 million

· Kingswood - (2004) Build 15 additional classrooms; upgrade existing classrooms, gym, administration, and student support services; reorient traffic and upgrade parking to address potential street closure. $8.2 million.

· Knightdale - (2003) Replace gymnasium with a full-size gym utilizing supplemental funding from the Town of Knightdale; air condition kitchen. $1.1 million

· Lacy - Upgrade ceiling, lights, toilets, carpeting in Building #2; provide covered walkway between Buildings #1 and #5; upgrade driveway and parking lot; grade site to correct erosion; replace splintered doors and window blinds. $330,000

· Lead Mine - Replace coating on roof for cafeteria, kitchen, and connectors. $125,000

· Lincoln Heights - Air condition kitchen; upgrade driveway and parking lot; correct erosion problems. $150,000

· Lynn Road - Upgrade HVAC system; upgrade driveway and parking lot. $475,000

· Millbrook - (2003) Reorient and consolidate campus towards Memory Lane; demolish gym, lockers, and dining/classroom building and rebuild to standard; abandon media/classroom building and reallocate it as a support building; expand parking and improve traffic patterns; provide deferred maintenance and modernization. $8.1 million.

· Morrisville - Upgrade HVAC; correct erosion problems; upgrade driveway and parking lot. $240,000

· North Ridge - Air condition kitchen; upgrade driveway and parking lot. $130,000

· Northwoods - Upgrade HVAC and replace rooftop units; upgrade driveway and parking lot; air condition kitchen; replace ceiling tile and front windows. $590,000

· Partnership - Upgrade HVAC; replace roof for two-story classroom wing. $155,000

· Penny Road - Replace roof coating for cafeteria, kitchen, and connectors; upgrade HVAC. $175,000

· Pleasant Union - Replace roof on classroom wings; correct erosion problems. $555,000

· Poe - Correct erosion problems. $10,000

· Powell - Replace main building roof; air condition kitchen; upgrade driveway and parking lot. $435,000

· Rand Road - Replace roof coating for cafeteria, kitchen, and connectors; upgrade HVAC. $175,000

· Rolesville - (2004) Upgrade gym; upgrade HVAC (replace heat exchanger serving entire campus); correct erosion problems. $2.0 million

· Root - Upgrade driveway and parking lot; air condition kitchen. $125,000

· Smith - Air condition kitchen; upgrade driveway and parking lot. $130,000

· Stough - (June 2003) Demolish annex building and build new classrooms; upgrade driveway and parking lot; correct erosion problems; air condition kitchen; create firewall in main building to comply with code. $1.7 million.

· Swift Creek - (December 2002) Upgrade gym. $1.0 million

· Underwood - Program specifics to be determined (including funds available in previous building program-Phase IIIB) $7.4 million.

· Vance - (December 2002) Upgrade existing gym and support spaces; expand dining area; modify traffic patterns and expand parking; provide deferred maintenance and modernization. $2.3 million.

· Vandora Springs - Replace roof for classroom and administration wings; air condition kitchen; correct erosion and moisture problems. $380,000

· Weatherstone - Correct erosion problems. $40,000

· Wendell - (2004) Upgrade gym; replace roof for low-slope areas of Building #1. $1.6 million.

· West Lake - Correct erosion problems; upgrade driveway and parking lot. $40,000

· Wilburn - Replace roof on Buildings #1 and #2; correct erosion problems. $510,000

· Wiley - Replace gym floor; provide new windows for main building and gym; provide storage building. $350,000

· Willow Springs - (December 2002) Upgrade existing gym and support spaces; provide covered walkway from main building and gymnasium; provide deferred maintenance and modernization. $0.9 million

· York - Air condition kitchen. $100,000

· Zebulon - Replace roof; air condition kitchen. $734,000

Middle Schools

· Apex - (2004) Construct classrooms, student support services and support spaces to consolidate campus and add seats; demolish Buildings #2, #3, #6, and #9; renovate and upgrade classrooms; upgrade assembly room to better serve as an auditorium; upgrade physical education and competition field to include track; upgrade traffic pattern and parking; provide deferred maintenance and modernization. $15.8 million

· Carnage - Repair and resurface asphalt track; correct erosion problems; improve football field. $80,000

· Carroll - Replace asphalt track; repair front driveway $120,000

· Daniels - (Phase A 2004) Upgrade main building; provide deferred maintenance and modernization; air condition kitchen. $4.5 million

· Durant Road - Provide air conditioning for PE area; provide storage for band instruments. $110,000

· East Cary - (2004) Build auditorium; renovate and construct classrooms; upgrade special education space, science, computer labs, vocational, home economics, etc; renovate kitchen and support spaces; upgrade bathrooms; expand and upgrade access points between student drop-off and buildings; upgrade athletic field; provide maintenance and modernization. $10.3 million

· East Garner - (2003) Construct 10 classrooms, auditorium, and support spaces; renovate and upgrade classrooms, toilets, corridors, etc. in older buildings; demolish existing gym/boiler building (Building #4) and build new gym with support spaces; expand dining; provide deferred maintenance and modernization; feasibility study required due to limited space on site. $10.6 million

· East Millbrook - Replace fire alarm system wiring; correct erosion problems; repair driveway and parking lot; improve football field. $235,000

· East Wake -Replace roof; improve football field; repair and resurface asphalt track; repair driveway and parking lot. $745,000

· Fuquay-Varina -(2003) Conduct feasibility study of maintaining standard school capacity with available property; construct classrooms and child nutrition services while consolidating campus; demolish buildings #2, #3, #5, #6, and #8, and abandon Building #7 (auditorium) for the Town of Fuquay-Varina; upgrade classrooms in Buildings #1 and #10; improve traffic patterns and parking; provide deferred maintenance and modernization. $14.5 million

· Leesville Road - Improve football field $10,000 (See improvements for Leesville Road High).

· Ligon - (Phase A 2004) Renovate and construct a performing arts wing consisting of auditorium, band, chorus, dance, orchestra classrooms and lobby for the performing arts facilities and gymnasium; replace vocational education wing; renovate art classroom; replace gym floor and windows; air condition kitchen; upgrade HVAC; replace windows in older buildings; repair driveway and parking lot; correct erosion problems; improve football field (to include new track); provide fence. $7.l million.

· Lufkin Road - Replace roof on two-story classroom building. $450,000

· Martin - Replace classroom carpet with floor tile; replace gym floor; replace hot water heater; replace asphalt track; repair driveway and parking lot; improve football field and provide fence; air condition kitchen; provide general upgrades. $682,000

· North Garner - (2004) Build classrooms, administration area, and auditorium; demolish Buildings #4 (field house), #5 (storage), and #6 (concessions); renovate classroom areas; upgrade science, performing arts, child nutrition, and physical education areas; renovate existing auditorium for classrooms and support areas; provide deferred maintenance and modernization. $10.8 million

· Wakefield - Improve football field. $10,000

· West Cary - Correct erosion problems; provide fence between football field and main campus; develop athletic fields to comply with current standards and in collaboration with Parks & Recreation. $960,000

· West Lake - Correct erosion problem; improve football field. $135,000

· West Millbrook - Replace fire alarm system wiring; upgrade HVAC by replacing chillers; air condition kitchen; repair and resurface asphalt track; provide fence for football field. $615,000

· Zebulon - Air condition kitchen; replace windows; correct erosion problems; repair driveway and parking lot; provide fence for football and softball fields. $375,000

High Schools

· Apex - Replace gym floor; provide additional parking and re-stripe existing parking lot. $305,000

· Athens Drive - (2003) Upgrade classrooms and space for hearing-impaired program; upgrade auditorium and media center, video production studio, and locker rooms; air condition kitchen; provide deferred maintenance and modernization. $6.8 million

. · Broughton - (2004) Upgrade auditorium; renovate drama room and adjacent classroom for dance/drama; upgrade classrooms, media center, cafeteria, gyms, etc.; replace central heating plant and upgrade system; upgrade traffic pattern and provide improvements for disabled, per ADA; air condition kitchen; provide deferred maintenance and modernization. $14.2 million.

· Cary - Upgrade driveway and parking lot; correct erosion problems. $70,000

· East Wake - (2003) Build 12 classrooms; construct physical education/athletic facilities and renovate support areas (south campus); repair and resurface asphalt track; repair driveway and parking lot; air condition kitchen. $8.1 million

· Enloe - (2004) Upgrade classrooms and athletic/physical education support spaces; air condition kitchen. $9.1 million

· Fuquay-Varina - Upgrade driveway and parking lot; improve baseball field. $220,000

· Garner - Replace roof for cafeteria and classroom addition; upgrade driveway and parking lot; correct erosion problems; air condition kitchen; expand stairwell in two-story building (pending code compliance and feasibility study). $980,000

· Leesville Road - (2003) Add ninth grade center to include 29 additional teaching spaces, sharing core facilities with existing school; expand middle school performing arts and dining. $16.3 million

· Millbrook - Replace roof for auxiliary gym, media center and classroom addition; upgrade driveway and parking lot; repair and resurface asphalt track and tennis courts; provide fence for football field; air condition kitchen. $1.1 million

· Sanderson - Repair and resurface track; provide fence for site and track; replace walkways and provide site lighting associated with stadium usage; replace floor tile for east building. $175,000

· Southeast Raleigh - Provide fence for softball field. $20,000

· Wake Forest-Rolesville - Replace roof for cafeteria, kitchen, administration, media center, and classrooms; repair and resurface asphalt track; correct erosion problems; improve traffic control for parking lot; expand cafeteria. $1.7 million

Special/Optional Schools

· Longview - (July 2002) Renovate for technology education; upgrade classrooms and administration; construct classrooms and support spaces to include science, music/drama classrooms, computer lab, physical education, media services, student support services and administration; expand parking and improve traffic pattern; provide deferred maintenance and modernization. $5.7 million

· Mt. Vernon Redirection - (December 2002) Upgrade classrooms; construct classrooms and support areas for Bridges program; relocate play area to accommodate age levels; upgrade abandoned gym for storage. $2.5 million

· Phillips -(December 2002) Renovate and construct seven additional classrooms to include nursery, art, music, technology education, and home economics; construct media/career center, multi-purpose/gym and child nutrition; upgrade and expand student support services, administration and staff support; improve traffic pattern and increase parking; provide deferred maintenance and modernization. $6.4 million

· Project Enlightenment - (2003) Renovate existing building; build new addition; upgrade landscaping and parking. $5.2 million