2008-09 Adopted Reassignment Plan for Millbrook Elementary

What's My Node?

The only way to know how if you are directly affected by the reassignment plan is to know what node you're in.

Note: New nodes were created for Staff Reassignment Plan. Please check to make sure your node number hasn't been changed.

Comments Not Active

We are not currently taking online comments about this proposal.

Note: School node maps, if available, are accessed from the profile tab.

Impact if Approved by the Board of Education

A spot node (685.0) that currently has no students residing within it will be reassigned from Millbrook to Green Elementary to consolidate the expanded Green base attendance area.

Proposed Node Changes

Click on an affected node to see all the proposed assignnment changes for that node.

Base Nodes In:

Reasons for Staff Recommendations

Capacity:  No additional mobile units for Millbrook Elementary are proposed at the current time.

Crowding:  Crowding was not a concern at this school in the development of these recommendations because enrollment can be controlled through the magnet school application process.

Healthy Schools:  The percentage of students from low-income families at Millbrook is too high at 55%. The percentage could be reduced by expanding magnet program enrollment at the school which may require reduction in the base assignment area of the school or expansion of the school facility through mobile or modular classrooms.

Long Range Planning:  The opening of E21 elementary school in 2010 may impact the base area of this school. Staff could not identify base nodes of significant size to reassign to other schools at this time.

Vital Statistics

Capacity
2007-08 Capacity 2008-09 Planned Capacity
647 647
Instructional Calendar
2008-09 Calendar
Traditional


Enrollment
2007-08 Enrollment 2008-09 Projected Enrollment
Without Proposed Changes
2008-09 Projected Membership
With Proposed Changes
696 703 707