2008-09 Adopted Reassignment Plan for Durant Road Elementary

What's My Node?

The only way to know how if you are directly affected by the reassignment plan is to know what node you're in.

Note: New nodes were created for Staff Reassignment Plan. Please check to make sure your node number hasn't been changed.

Comments Not Active

We are not currently taking online comments about this proposal.

Note: School node maps, if available, are accessed from the profile tab.

Impact if Approved by the Board of Education

Approximately 70 students from the portion of node 242.0 located south of Trawick Road will be reassigned from Durant to Brooks. The travel time for these students will be reduced slightly. A few year-round application nodes will be reassigned to Oak Grove Year-round to consolidate transportation patterns. Approximately 18 current application students may be impacted.

Proposed Node Changes

Click on an affected node to see all the proposed assignnment changes for that node.

Base Nodes Out:

Y-R Nodes Out:

Reasons for Staff Recommendations

Capacity:  No change is planned for the eighteen mobile units at Durant for 2008-09. Efforts to limit enrollment at Durant will continue for the next several years and lead to removal of some of the existing mobile classrooms.

Crowding:  Crowding will be reduced at Durant through both a reduction in the base area of the school and a reduction in the number of year-round applicants placed in the school.

Healthy Schools:  The percentage of students from low-income families will decline slightly from 33% to 28%.

Long Range Planning:  Future schools opening in 2009, 2010, and 2011 are not expected to significantly impact the attendance area of this school.

Vital Statistics

Capacity
2007-08 Capacity 2008-09 Planned Capacity
921 921
Instructional Calendar
2008-09 Calendar
Year-Round


Enrollment
2007-08 Enrollment 2008-09 Projected Enrollment
Without Proposed Changes
2008-09 Projected Membership
With Proposed Changes
1091 1188 1088