2008-09 Adopted Reassignment Plan for Adams Elementary

What's My Node?

The only way to know how if you are directly affected by the reassignment plan is to know what node you're in.

Note: New nodes were created for Staff Reassignment Plan. Please check to make sure your node number hasn't been changed.

Comments Not Active

We are not currently taking online comments about this proposal.

Note: School node maps, if available, are accessed from the profile tab.

Impact if Approved by the Board of Education

Approximately 75 students from Node 384.8 will be reassigned from Adams to Olive Chapel Elementary. A portion of the Adams transportation area will be eliminated as base areas are assigned to the new year-round Laurel Park Elementary and additional nodes are assigned as base areas to other year-round schools. The Board of Education decided to expand the Adams transportation area for year-round applications and reassign year-round applicants from Oak Grove. The projected enrollment will fluctuate depending upon the number of year-round applications in February.

Proposed Node Changes

Click on an affected node to see all the proposed assignnment changes for that node.

Base Nodes Out:

Y-R Nodes Out:

Y-R Nodes In:

Reasons for Staff Recommendations

Capacity:  No change is planned for the nine mobile classrooms at Adams.

Crowding:  Adams will be below capacity until applications to the year-round program replace students the school will lose to the new Laurel Park year-round school. In calculating growth, the projection software applies the same growth factor to the year-round application students as it does to the students in base nodes. Since these are application students in a node and not base students, the impact of either losing or gaining students may not be as large as indicated.

Healthy Schools:  The Board decided that a node from Adams' base area be assigned to Olive Chapel Elementary to help raise the percentage of low-income families at Olive Chapel from 5% to 15%. The percentage at Adams will fall from 30% to about 21%.

Long Range Planning:  Additional schools opening through the 2011-12 school year should not impact Adams' base area or year-round application area.

Vital Statistics

Capacity
2007-08 Capacity 2008-09 Planned Capacity
838 838
Instructional Calendar
2008-09 Calendar
Year-Round


Enrollment
2007-08 Enrollment 2008-09 Projected Enrollment
Without Proposed Changes
2008-09 Projected Membership
With Proposed Changes
768 750 672